Customization

Three routes, from recolouring an existing mould to full private tooling — every one with a review gate before production.

Existing mould

Recolour and print

The fastest route: choose a mould from our library, match the colour and apply decoration. No tooling cost, 7–10 day samples, MOQ from 5,000 pcs.

Private mould

New tooling

Your 3D file or a reference sample becomes a die. Tooling in 25–30 days with a review gate before steel cutting; the mould is yours and can be moved or duplicated.

Full pack

Bottle + tube + jar

A single launch often needs three components. We colour-match across parts, share one Pantone reference and deliver everything under one QC sign-off.

Custom options

What you can specify

Pantone colour matching

Solid colour to your reference, with a physical chip for approval.

Matte / gloss / frosted

Applied to the mould or as a coating, chosen with the decoration.

Silk-screen printing

Opaque, durable print for logos and solid type.

Offset printing

Fine detail and gradients for tubes and flat panels.

Hot stamping

Real metallic foil that reads differently from metallic ink.

UV metalizing

Full-surface metal effect at a fraction of metal component cost.

Private moulds

A shape that is exclusively yours, from 3D review to trial samples.

Applicator assembly

Roller, ceramic, sponge and nozzle heads fitted and torque-checked.

Tube customization

The full tube programme

Tube tooling differs from bottle tooling: the die sets the diameter and the web, the shoulder sets the orifice, the head sets the dose. All three are fixed before artwork.

Tube material

Single-layer PE, 5-layer ABL, EVOH PBL, impact-extruded aluminium, PCR-PE and bio-based HDPE, mono-material where the recycling position requires it.

Custom shape

Oval, round, flat and teardrop webs; shoulder, orifice and crimp profile drawn to your 3D or a reference sample.

Applicators

Roller, ceramic, sponge, brush, nozzle, cooling metal and dual heads — over a thousand tooling combinations, matched and torque-checked.

Decoration

Offset, silk screen, hot stamp and UV on the tube body; crimp-side batch and expiry coding in-line.

Seal & closure

Crimp or ultrasonic seal, flat or round caps, flip-top and child-resistant options, colour-matched to the body.

Private tooling

Tube die, shoulder and applicator tooling in 25–30 days, with a 3D review gate before steel cutting.

Workflow

From drawing to delivery

  1. 01

    Drawing or sample

    Send your 3D, a sketch or a physical reference tube.

  2. 02

    Structure & specs

    Material, diameter, orifice and applicator confirmed with a quotation.

  3. 03

    Sample

    10–14 days for an existing die, 25–30 days with a new tool.

  4. 04

    Sign-off

    Colour, print, torque and seal criteria agreed on the approved sample.

  5. 05

    Production & QC

    Extrusion, sealing, coding and inspection under one quality system.

  6. 06

    Delivery

    Open-ended or sealed and coded, with material certificates.

Materials

Resins and structures

MaterialFormatsNotes
PET / PETG30–500 ml bottlesClear, frostable; 24/410 necks
HDPE / PCR-HDPE20–500 ml bottlesBlow moulded; opaque, durable
PP / PCR-PPJars, airless, capsWide temperature range; 30–70% PCR
PE / ABL / PBLTubes D19–D50Single layer to 5-layer barrier
AluminiumTubes, foilsImpact extruded, internally lacquered
AcrylicJars 15–200 gDouble-wall prestige formats

Sample policy

Stock samples are free; you cover courier. Custom samples with new tooling or decoration carry a charge that is credited against the bulk order.

Lead times

Samples 7–10 days (tubes 10–14), private tooling 25–30 days, bulk 15–20 working days after sign-off. Sea to Europe 30–40 days, air 5–7 days.

Have a drawing or a reference sample?

Send both and we will confirm structure, mould status and price in one reply.

Get Free Quote